Thermal Power - Industry – Focus

 

Custom Search

Kaveri Gas Power Ltd to set up 80 MW coal based thermal project at Gummidpoondi

Kaveri Gas Power Ltd to set up 80 MW coal based thermal project at Gummidpoondi in Thiruvallur district of Tamil Nadu. The land requirement is estimated as 65 acres. Imported coal will be used as fuel. Its requirement is estimated as 2.9 lakh TPA at 80% PLF. It will be transported by road from Ennore Port. Water requirement is 6.7 m3/hr, which will be met from groundwater. Air cooled condenser will be provided.

More Articles

Custom Search

Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202   Mobile : 0-97898-37940 email : [email protected] Privacy Policy