Orissa Power Projects

Utkal Power to 2x60 MW Coal based Thermal Power Project at Choudwar

Utkal Power to 2x60 MW Coal based Thermal Power Project at Choudwar in Cuttack district of Orissa. The land requirement for the project is 60 acres. CFBC boiler with lime injection with efficiency of sulphur removal upto 90% will be provided. Water requirement is 460 m3/hr, which will be obtained from Birupa ? a tributary of river Mahanadi at a distance of 3 km. The coal linkage is available with the group company. NOC have been obtained from Aviation Research Centre, Charbatia, which is at a distance of about 2 km, for setting up this power project and stack height has been restricted to 48 m AGL. The total project cost is estimated at Rs. 4397 million.

Jindal India Thermal Power to set up 1200 MW (2x600 MW) Thermal Power Project at village Derang


 

Jindal India Thermal Power to set up 1200 MW (2x600 MW) Thermal Power Project at village Derang in Angul district of Orissa.  The project will be based on pulverized coal fired sub-critical boilers.  The land requirement is 950 acres.  Water requirement is estimated as 36 cusecs and will be met from upstream of Samal Barrage on Brahmani river.  The coal requirement is estimated as 5.64 million TPA at 80% PLF.  Letter of assurance from MCL mines has been obtained for 1.204 million TPA.  The balance quantity will be met from Mandakini Coal Block in Talcher Coalfields, which has been allocated along with two other user companies. The total project cost is estimated at Rs. 54000 million.

Balasore Alloys to set up 2x67.5 MW Captive Power Project at village Balgopalpur


Balasore Alloys to set up 2x67.5 MW Captive Power Project at village Balgopalpur in Balasore district of Orissa. The total land requirement for the project is 134 acres. Water requirement is 549 m3/hr, which will be obtained from Burhabalanga river.   Coal will be obtained from Talcher Coalfields of MCL. CFBC technology will be used. The total project cost is estimated at Rs. 6259 million. It may be noted, Kuldiha Sanctuary is reported to be at a distance of about 12.5 km from the project site.

More Articles

Custom Search

Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202   Mobile : 0-97898-37940 email : [email protected] Privacy Policy