Lanco Amarkantak Power to set up 660 MW Amarkantak Thermal Power Project Expansion Unit No. 4 near Patadi in Korba district of Chhattisgarh. The project will be based on super critical technology. The water requirement is 21 cusecs, which will be obtained from Hasdeo river. Coal from SECL will be used as fuel. The land requirement is 464
Latest News
Boiler Structure under advance stage of erection TG Deck of Unit # 3 completed Chimney shell casting completed EOT Crane in Power Block commissioned
Land : Available
Fuel Source (Coal) : South Eastern coal Fields
Water Source : River Hasdeo
Clearances : All Major statutory clearances in place
Lanco Power Limited Plot No. 397, Phase-III, Udyog Vihar, Gurgaon - 122016 Haryana - India. Phone No. +91-124 - 4741000/01/02/03 Fax +91-124 - 4741024 Plant Office : Village-Pathadi,P.O-Tilkeja, Korba 495 674 Chhattisgarh, India Phone No. +91-7759-279 938/ 915
East Coast Energy to set up 2640 MW Bhavanapadu Thermal Power Project located near Kakrapalli Village in Srikakulam district of Andhra Pradesh. The project will be implemented in two phases with super critical technology. The project will use blended coal, Indian: Imported in the ratio of 70:30 for the first phase of 1320MW of the project. For phase - II of the project- imported coal will be used. Imported coal requirement for both the phases will be 5.838 MTPA. Indigenous washed coal requirement will be 4.34 MTPA. Imported coal will be transported by sea to the dedicated Jetty at Meghavaram village and indigenous washed coal will be transported through railway to the project. Total cost of the project is Rs. 110750 million.
Andhra Pradesh Industrial Infrastructure Corporation (APIIC) has transferred the title of Land (2050Acres) to ECEPL. EPC contract: Contract Agreement for Boiler – Turbine - Generator (BTG) Supply has been signed with Dongfang Electric Company (DEC), Republic of China. Coal Linkage for 70% of the coal consumption for stage-1 (2x660 MW) has been allocated from Mahanadi Coal Fields Limited, Orissa. Letter of Assurance (LOA) issued by MCL. ECEPL has signed Fuel Supply Agreement for supply of imported coal with Global Fuels Pte. Ltd. for 30% of the fuel required. GoI, MoC has stipulated that coastal based plants need to source 30% fuel from outside the country. All mandatory clearances from statutory bodies have been obtained.
Preparation of Detailed Project Report for Captive Jetty & Transportation and Investigation Studies like Bathymetric & Sub-bottom profile survey, Geo-Technical Investigations, Hydrodynamic studies and Vessel Mooring & Manoeuvring Study are completed. Long Term Power Purchase Agreement has been signed with PTC India Limited for off take of power. Long term Open Access has been applied for and the CTU (PGCIL) has commenced related system strengthening studies. PGCIL has included the project in southern region studies and revised load flow studies are being made.
PROJECT CONSULTANTS Energy Infratech Private Limited (EIPL) (EIPL) is the Owner’s Engineer for the project. EIPL’s thermal power division is based at Hyderabad with a thermal power portfolio of around 5,000 MW currently under development. B. S. Envi-tech Private Limited is the environment consultant for preparation of Environment Impact Assessment/ Environment Management Plan and assisted the company in obtaining the Environment Clearance from the Ministry of Environment & Forests, Government of India. Indomer Coastal Hydraulics Private Limited has carried out the Marine Impact Assessment Studies. National Institute of Oceanography has undertaken studies for HTL, LTL and CRZ demarcation. Aarvee Associates Private Limited is helping in getting approvals from Railways for coal logistics. Beckett Rankine has prepared the Detailed Project Report for construction of Captive Jetty and Transportation near the project site.
Latest News
The project construction is on and is likely to be completed by 2014. The project work had been briefly suspended during May 2012 due to protests. Mr. DSA Raju, Project Director / Mr. B Narasimha Rao, Vice President (Projects)
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : [email protected] Privacy Policy